Usually you can’t tell from the calendar, and you don’t need to. Google doesn’t publish a week-by-week schedule for SEO, its ads documentation measures the learning period in conversion cycles rather than weeks, and nobody official publishes one for an app MVP. What does exist is a set of checkpoints you can see in your own accounts. If the checkpoint for your stage is there, a slow month is probably normal. If it isn’t, the calendar won’t save the vendor.
The tables below don’t invent week numbers. Where Google, Apple or Google Play publish a time range, we quote and link it. Where they don’t, you get the check instead.
How long does SEO take, according to Google?
Google no longer gives a number. For years its Do you need an SEO? page told site owners that results take “typically from four months to a year from the time you begin making changes” (archived copy, April 2026). The version updated on 5 June 2026 dropped that sentence. What’s left is a question Google suggests you put to the SEO directly: “What kind of results do you expect to see, and in what timeframe?”
The SEO Starter Guide is vaguer still: some changes show up in a few hours, others take several months, and you’ll likely want to wait a few weeks before judging a change. Anyone quoting an exact month is giving you their own estimate. That’s fine if they wrote it down before you signed.
| Period | What normally happens | What is NOT normal | What to ask the vendor |
|---|---|---|---|
| Start (before any changes) | Audit and a written plan. Google’s own advice is to give an auditing SEO read access to Search Console, not write access (source). | The vendor wants owner-level access before showing you any findings, or won’t put the plan in writing. | “Which pages will you change first, and what do you expect to move?” |
| After changes go live | Google has to recrawl the pages, which “can take anywhere from a few days to a few weeks” (source). | Weeks later, changed pages still show as not indexed in URL Inspection. | “Show me URL Inspection for the five pages you changed.” |
| A few weeks after a change | The earliest point Google suggests for judging a change (source). | No movement on the pages worked on, and no explanation. | “What did you expect to see by now, and what will you change if it doesn’t come?” |
| After a redesign or URL change | Rankings fluctuate. For a small to medium site, most pages can take a few weeks to move to new URLs (source). | Old URLs return 404 instead of redirecting; the drop keeps deepening after that window. | “Send me the redirect map: every old URL and where it now points.” |
| Month 4 onward | Where Google’s former range began. Search Console shows which customer queries the worked-on pages appear for. | Monthly reports show rankings and traffic only, never leads, calls or sales. | “Which of these queries brought an enquiry?” |
Is a traffic drop after a redesign normal?
A short dip is common; a deep, lasting one usually has a technical cause you can find in an afternoon. One small-business owner whose agency relaunched the site asked: “Is it normal to see a 50% drop in clicks from Google the first 30 days”. Clicks had gone from 100–120 a day to 50–60.
The useful replies skipped the calendar and went to checks. We’d give you the same ones:
- Redirects. Every changed URL needs a 301 to its new address, or ranked pages become 404s.
- A leftover
noindextag. Staging sites are blocked from Google on purpose, and the tag sometimes ships with the launch. - The Page indexing report in Search Console. A spike in “Not found (404)” or excluded pages right after launch points at the migration.
- Seasonality. Compare with the same weeks last year before blaming anyone.
- A Google update. Check Google’s Search Status Dashboard for a ranking update that overlaps your launch date.
If all five are clean and the drop is still there after the few-weeks window Google describes for site moves, then you have a real question for the vendor. If one of them fails, you don’t need to wait at all.
Is it normal for a new PPC campaign to get no leads at first?
For the first few days, yes. After that, “normal” depends on two things you can check yourself: working conversion tracking and enough conversions to learn from. Google documents both, so this is the most precise of the three tables.
| Period | What normally happens | What is NOT normal | What to ask the vendor |
|---|---|---|---|
| Launch | Ads go through policy review. “Most ads are reviewed within one business day” (source). | Still under review after 2 full business days with nobody checking the status; after a week, Google says to contact support. | “What’s the ad status today, and have you contacted Google?” |
| First week | Conversion actions show a status under Goals → Summary. “Awaiting conversions” means none in 7 days and is typical for an action created under 48 hours ago (source). | Status is “Misconfigured”, or “Awaiting conversions” while the campaign is getting clicks. | “Send a screenshot of the conversion Summary page and the test lead you submitted.” |
| Learning period | After a new or changed automated bid strategy, the campaign may show “Learning”. Google says calibration takes a few conversion cycles, “1-2 typically” (source). | “It’s still learning” on a Manual CPC campaign, where Google says learning doesn’t apply; or bid settings changed every week, so it never stops learning. | “How long is our conversion cycle, and when do you expect Learning to clear?” |
| First evaluation | Google’s guidance is to judge Smart Bidding over at least 2 full conversion cycles, or longer: a month, or at least 50 conversions (source). | Half the monthly budget gone in the first days with no plan for the rest of the month. | “Show me the search terms report: what did people actually type before clicking?” |
| Every month after | Someone is changing things: negatives, ads, bids. Change history lists edits for the past 2 years and who made them (source). | No edits for months. | “Send the change history for last month along with the report.” |
A tattoo-studio owner opened the account and found three campaigns, all launched months earlier, with the last significant edit 230 days old. The owner’s question was the one this page is named after: “Is this normal, or its safe to assume the “ppc manager” isnt doing anything?” There had never been a report or a call either. Untouched campaigns can be a deliberate choice when they perform well; months of silence about that choice is not.
Early judgment goes wrong in both directions. In another thread, a service business had spent about $1,700 of a $3,000 monthly budget in two weeks with zero conversions. Some practitioners called two weeks too early; others asked whether tracking worked at all. Both were right. Two weeks is too early to judge the strategy, and not too early to check that a test form submission shows up as a conversion.
How long should an app MVP take?
No official source gives a duration, and we won’t make one up: scope, platforms and team size move it too much. You can check milestones, and at the end, store rules with published times. For the stages in more depth, see our app development process guide.
| Checkpoint | What normally happens | What is NOT normal | What to ask the vendor |
|---|---|---|---|
| Scope signed off | A written list of what is in and out of the first release, plus the core user flows. Duration varies. | Coding starts with no written scope, or scope changes weekly with no change log. | “Which features are explicitly out of version one?” |
| First working build | Something you can install or click through on your own device, early. | Progress shown only as screenshots, or as demos on the developer’s machine. | “Can I install today’s build on my phone?” |
| Ongoing increments | New builds at the cadence agreed in the contract, with code going into a repository you can see. | Updates stop, or the answer to “where’s the code?” is “after final payment”. | “Add me to the repository, please.” See who owns your code. |
| Store submission (Apple) | Apple says App Review typically handles at least 50% of submissions in under 24 hours and 90% in under 48 hours (source). | The launch plan has no slack for a rejection and resubmission. | “What’s our plan if review rejects the first submission?” |
| Store submission (Google Play) | Reviews for certain developer accounts can take up to 7 days, or longer in exceptional cases (source). Personal developer accounts created after 13 November 2023 must first run a closed test with at least 12 testers opted in for 14 consecutive days (source). | A launch date that ignores the 14-day closed test, or an app published under the vendor’s account rather than yours. | “Whose Play Console account is this, and when does the closed test start?” |
That closed test is a fixed two-week minimum no developer can shorten. A vendor who has shipped Android apps recently should raise it before you ask.
When should you stop waiting and act?
Act as soon as a checkpoint fails, not when a number of weeks runs out. Waiting is reasonable when the work is visible and only the result is slow: changes logged, tracking active, builds installable. Waiting is a mistake when the work itself is invisible. No change history, no access, no report, no build you can touch. No timeline makes that normal.
A vendor who welcomes the questions in the right-hand columns is usually fine. One who treats them as an insult has answered them already.
FAQ
My SEO agency says results take 6–12 months. Is that a stall? Not by itself. Google itself used a four-months-to-a-year range until June 2026. The stall shows up elsewhere: if after a few months you can’t see which pages were changed and whether Google has indexed them, the long horizon is covering for missing work.
How long should I give a new PPC agency before judging it? Judge the setup in week one (ads approved, conversion tracking active) and the strategy after at least 2 full conversion cycles, a month or 50 conversions, as Google’s own guidance puts it. If tracking isn’t working, the clock hasn’t started.
Is it normal for an MVP developer to keep the code until the end? No. You should be able to see the repository while the work is happening. That’s a contract point; pricing models that pay by milestone make it easier to enforce.
What timeline should I ask for at the pitch? Ask the question Google suggests, “What kind of results do you expect to see, and in what timeframe?”, and get the answer in writing. Our list of pitch questions and good answers covers how to judge the reply.
What to do this week
Open the screen for your channel: Search Console’s Page indexing report for SEO, Goals → Summary and change history for PPC, the latest build on your own phone for an app. Then send your vendor the questions from the right-hand column for the period you’re in. If the answers come back vague, the 15-minute monthly check shows you where to look next, and the hiring a vendor hub covers the rest of the relationship, from contract to exit.